KP Energy receives NoA from NTPC REL for 464.10 MW BoS package for wind energy project in Gujarat

Surat (Gujarat) [India], October 2: KP Energy Limited, a leading player in the renewable energy sector, has achieved a significant milestone by receiving a Notification of Award (NOA) from NTPC Renewable Energy Limited (NTPC REL) for a 464.10 MW Balance of System Package. This package is part of an Inter-State Transmission System (ISTS) Connected Wind Energy project in Gujarat.

KP Energy clinched the contract from NTPC REL, a subsidiary of NTPC, through a rigorous and highly competitive bidding process, reaffirming its excellence in the renewable energy domain. The project falls under the company’s Captive Power Producer (CPP) business segment.

Under the contracts, KP Energy will provide a comprehensive suite of services, including Engineering, Procurement, Construction, and Commissioning (EPCC). These services encompass the acquisition and transfer of land for the project, the supply of all necessary equipment for the balance of plant, and the provision of various services related to unloading, storage, on-site handling, installation, insurance, civil and allied works, integration into the grid, testing, and commissioning. Additionally, the company will be responsible for the operation and maintenance of the contract scope for three years, ensuring its optimal performance and reliability.

Dr. Faruk G Patel, Chairman and Managing Director of KP Group, said, “We are thrilled to receive the Notification of Award for this vital project from NTPC REL. It underscores our strong presence in the renewable energy sector and our expertise in the timely execution of challenging projects. The project aligns with our mission to contribute to sustainable energy solutions and reflects the trust clients have in our project execution capabilities. KP Group remains committed to delivering high-quality renewable energy projects that contribute to India’s green energy goals and promote a cleaner and greener future.”

As per the contract, the project is slated to be completed within 21 months from the date of the NOA.

Earlier, KP Energy successfully commissioned a 29.4MW (Phase-II) ISTS-connected wind power project comprising 14 WTGs of 2.1 MW each at Sidhpur site in Devbhumi Dwarka.

Related Posts

MotionGravity Develops Human Authenticity Registry to Bring Paid, Consent-Based AI Participation to Everyday People

HAR is being designed to help real people voluntarily participate in AI projects, verify consent through selective disclosure, and earn from eligible contributions while supporting authentic human-origin data for AI…

The Southern Bypass Comes of Age: Srijan Realty Launches Orizon to Anchor South Kolkata’s Urban Renaissance

Kolkata (West Bengal) [India], September 19: The Southern Bypass has systematically evolved from a peripheral transit route into one of South Kolkata’s most closely watched residential and lifestyle corridors. This…

You Missed

Essential Baby Travel Gear Every Parent Needs – Recommended by Loopie

  • By
  • September 19, 2026
Essential Baby Travel Gear Every Parent Needs – Recommended by Loopie

Wealthy Nivesh Multi-Asset FoF PMS Reaches 10-Month Milestone Across Volatile Market Cycles

  • By
  • September 19, 2026
Wealthy Nivesh Multi-Asset FoF PMS Reaches 10-Month Milestone Across Volatile Market Cycles

Engineers’ Day Celebrated at IPS Academy, Institute of Engineering and Science, Indore

  • By
  • September 19, 2026
Engineers’ Day Celebrated at IPS Academy, Institute of Engineering and Science, Indore

India International Jewellery Awards 2026 Receives Overwhelming Industry Response with Around 200 Nominations

  • By
  • September 19, 2026
India International Jewellery Awards 2026 Receives Overwhelming Industry Response with Around 200 Nominations

ICRAPAIN 2026 Brings 600 Plus Pain Professionals to Kolkata, Highlights Advances in Pain Biologics and Regenerative Medicine

ICRAPAIN 2026 Brings 600 Plus Pain Professionals to Kolkata, Highlights Advances in Pain Biologics and Regenerative Medicine

ODDS Longevity Concludes ‘The Silent Decade’ Symposium

  • By
  • September 18, 2026
ODDS Longevity Concludes ‘The Silent Decade’ Symposium